Thanks to the use of Geoconnect® connectors, we managed to unite structural performance and economic savings in Microsoft’s building in Dublin.
Microsoft Ireland Dublin Campus
Irlanda · Geoconnect®
Challenge
- To achieve a design for joints conferring all the guarantees under the CE marking at an affordable price.
Solution
Use of Geoconnect® connectors with the CE marking ensuring a guarantee for the developer / designer / constructor.
In turn, the optimised design of such accounts for significant savings in the manufacturing processes, without diminishing the structural performance, which leads to a major economic advantage.